SOME OF OUR PROJECTS
CURRENT PROJECTS
AngloGold Ashanti – Iduapriem Mine
- AMAX: Joint Venture with AMS, currently mining at AGA Iduapriem;
- Mining approx. 18 million BCMs annually;
- Contributing a fleet comprising 6 excavators, 20 rigid dump trucks, 8 articulated dump trucks, 4 dozers, 4 drill rigs and other ancillary equipment;
- JV currently employing 673 staff.
Asante Gold – Chirano Gold Mine
- Mining approx. 6 million BCMs annually;
- Fleet comprising 4 excavators, 41 articulated dump trucks, 5 dozers, 5 drill rigs and other ancillary equipment;
- Currently employing 360 staff.
PAST PROJECTS
AngloGold Ashanti – Iduapriem Mine
- Block 7/8 Cut 1, 2 &3; Block 5 Mining
- Ajopa Pit Mining: Drill, Blast, Load and Haul
- 15 km overland ore delivery to Plant, inclusive of road maintenance
- Crusher feed from various stockpiles with ADTs and wheel loaders
- Earthworks on TSF with WBHO
- Rock Placement for the Beposo Tailings Project under the AMAX JV
Kinross Chirano Gold Mine
- Open Pit Mining Services: Drill & Blast, Load & Haul
Golden Star Resources
- HBB-Benso: 80 km haul road construction & Maintenance + Ore Haulage
- Mpohor Satellite Pit: Load and Haul from pit to stockpile
- Wassa Mine: Crusher Feed
Newmont Ghana Gold Project
- Site preparation and Earthworks with WBHO