SOME OF OUR PROJECTS

CURRENT PROJECTS

AngloGold Ashanti – Iduapriem Mine

  • AMAX: Joint Venture with AMS, currently mining at AGA Iduapriem;
  • Mining approx. 18 million BCMs annually;
  • Contributing a fleet comprising 6 excavators, 20 rigid dump trucks, 8 articulated dump trucks, 4 dozers, 4 drill rigs and other ancillary equipment;
  • JV currently employing 673 staff.

 

Asante Gold – Chirano Gold Mine

  • Mining approx. 6 million BCMs annually;
  • Fleet comprising 4 excavators, 41 articulated dump trucks, 5 dozers, 5 drill rigs and other ancillary equipment;
  • Currently employing 360 staff.

 

PAST PROJECTS

AngloGold Ashanti – Iduapriem Mine

  • Block 7/8 Cut 1, 2 &3; Block 5 Mining
  • Ajopa Pit Mining: Drill, Blast, Load and Haul
  • 15 km overland ore delivery to Plant, inclusive of road maintenance
  • Crusher feed from various stockpiles with ADTs and wheel loaders
  • Earthworks on TSF with WBHO
  • Rock Placement for the Beposo Tailings Project under the AMAX JV

 

Kinross Chirano Gold Mine

  • Open Pit Mining Services: Drill & Blast, Load & Haul

 

Golden Star Resources

  • HBB-Benso: 80 km haul road construction & Maintenance + Ore Haulage
  • Mpohor Satellite Pit: Load and Haul from pit to stockpile
  • Wassa Mine: Crusher Feed

 

Newmont Ghana Gold Project

  • Site preparation and Earthworks with WBHO